3D Modeling and Coordination

Spatial Coordination of the Mechanical and Electrical Services and Systems within the building envelope and of underground utilities is specialist work requiring technical expertise, an ability to visualize services in their eventual 3D relationship and experience in minimizing interdisciplinary conflicts on site.

Spatial constraints in ceiling voids, plant rooms and riser spaces require that the Mechanical and Electrical Systems (Building Services) be coordinated trade to trade and with the architectural and structural envelope of each development.

Underground Utilities similarly need proper planning to ensure installations can be constructed without interference.

From our Coordination work, Forssman’s experienced coordination Engineers and CAD staff ensure that before work commences on site, the Complete Combined Coordinated Services and Builder's Work Drawings are available to guide the construction, fabrication and installation works.

Forssman provides this service either as part of the design phase works or during the construction phase and as such we work either with the Clients' Consultants directly or with the General/Main Contractor of the project.

Our approach, producing these drawings as part of the main contract start up or during consultant design phase works, reduces lead-time on shop drawing preparation. By minimizing the risk of interdisciplinary conflicts on-site, costs are controlled and rework is virtually eliminated. Construction quality is significantly improved by ensuring the work can proceed "Doing it Right the First Time”.

Advantages of 3D Modeling

• Improved productivity due to easy retrieval of Information
• Elevated level of communication across disciplines due to visualization and interference checks
• We can recommend alternate solutions while preserving design intent
• Ensure design can be built to meet targeted schedule and cost.

4D Construction

The 3D model can be linked directly to a contractors programme or schedule to create virtual construction sequences. In doing so, we provide a 4D model which allows contractors and planners to easily visualize a construction sequence and to develop effective method statements. It is easier to;

• Identify the critical path
• Resolve build ability problems
• Communicate ideas effectively with all the project stakeholders

 





INTEGRITY • INNOVATON • PASSION • EXCELLENCE • LEADERSHIP • HUMANITY
© Copyright 2010
Forssman Pacific Corporation
E-mail: info@forssmangroup.com
Phone: +632 8139074
Address: 2nd Floor Prince Building 117 Rada Street, Legaspi Village Makati City, Philippines 1229
Office Location
Request for Information
Webmaster